ReportDraft ConstructionCA

Construction Punch List

The list of work still to finish or fix before a project is closed out: every item by area and trade, who is responsible, the due date, and the next walkthrough, from the notes taken on the walk.

ReportDraft Construction from C$16 a month. 14-day free trial with your first report and up to 5 template downloads. Card required, nothing charged today, cancel anytime. Need just one? One punch list for C$25, no subscription.

Punch listSAMPLE

Sample notes, 181 words

Project: Cedar Grove Duplex, Unit A
Address: 27 Birch Lane
Walkthrough date: Oct 20, 2026
Prepared by: Lena Park, project manager
Owner: Marcus Bell
...
FREE PREVIEW OF THESE NOTES
100%of your draft is ready from these notes

We sorted 21 items into 10 sections and flagged 1 to fix first.

  • Fix firstElectrical and lighting

    Two garage outlets missing cover plates, exposed wiring

  • Fix soonWalls, ceilings and paint

    Living room drywall: nail pops and a dent by the front door, patch and paint

  • Fix soonElectrical and lighting

    Kitchen pendant light not working, check circuit

Filled in for you

Project nameCedar Grove Duplex, Unit A
Project address27 Birch Lane
Walkthrough dateOct 20, 2026
Prepared byLena Park, project manager
Start free and draft yours

14 days free, nothing to pay today. After your first report, your name, licence and company details fill in by themselves. Or preview your own notes first, no sign-up.

What goes in it

Every punch list from ReportDraft follows the same professional structure, so clients and reviewers find things where they expect them.

  • Walls, ceilings and paintDrywall: nail pops, dents, cracks and tape seams, Paint and touch-ups, Ceilings
  • Doors, hardware and windowsDoors: swing, fit, rubbing and weatherstripping, Locks, handles and hardware, Windows, glass and screens
  • Flooring and tileHardwood, carpet, vinyl and laminate, Tile, grout and caulk
  • Cabinets, counters and trimCabinet doors, drawers and alignment, Countertops and seams, Trim, baseboards and casings
  • Electrical and lightingOutlets, switches and cover plates, Light fixtures, Smoke and CO alarms
  • Plumbing and fixturesFaucets, toilets, sinks and showers, Drains and leaks, Water heater
  • Heating, cooling and ventilationHeating and cooling equipment and thermostats, Vents, registers, exhaust fans and dryer vent
  • Exterior and siteSiding, roof, gutters and downspouts, Walks, driveway, patio and steps, Grading and landscaping
  • Cleaning and closeoutFinal clean, debris and labels removed, Keys, manuals, warranties and closeout documents
  • Completion and next walkthroughOne to three sentences from the notes on when the items are due, who confirms them, and the date of the next walkthrough or final sign-off. If the notes give no dates, say the items will be confirmed at the next walkthrough.

How it works

1. Add your notes. Type or paste what you saw. Rate items with one tap if you like.

2. Get a draft. Findings, recommendations and a summary are written for you, in your report's structure.

3. Check, sign, send. A completeness list shows anything missing. Sign to lock the PDF and download Word too.

Why it pays for itself

Without ReportDraftWith ReportDraft
Typing up every report after hoursA finished, professional report in minutes
Looking up your province or territory's rules and hoping you caught them allYour province or territory's required items on the checklist, each cited to the official text
Copying the last report and fixing the namesA clean PDF to send and a Word file to edit, with your company details
Paying for a whole software suite to print one reportA plan for your line of work, from one report a month
Start your Construction membership free14 days free. Nothing to pay today. Cancel online anytime.

Template preview

REPORTDRAFT.CA
Construction Punch List Template
Project name
Project address
Walkthrough date
Prepared by
Owner or client
Contractor
Download in Word or PDFIncluded with ReportDraft Construction and its free trial.

Questions

What goes in a punch list?

The list of work still to finish or fix before a project is closed out: every item by area and trade, who is responsible, the due date, and the next walkthrough, from the notes taken on the walk. ReportDraft lays it out in 10 sections: walls, ceilings and paint, doors, hardware and windows, flooring and tile, cabinets, counters and trim, electrical and lighting, plumbing and fixtures, heating, cooling and ventilation, exterior and site, cleaning and closeout, completion and next walkthrough.

Do my province or territory's rules change the report?

Pick your province or territory when you start. Where we have checked a local requirement against official sources, it is added to your completeness list with a link to the source.

Can I edit the draft?

Yes. Every finding, rating and sentence is editable before you sign. Your own entries always win over anything drafted from your notes.

What do I get at the end?

A signed, locked PDF for your client and an editable Word file, both with your company details. Signed reports keep a fingerprint so later changes are visible.

Which plan covers it?

ReportDraft Construction covers a punch list along with site safety inspections, incident reports. Daily Construction Reports is also sold on its own.

Part of ReportDraft Construction

Construction: every report and plan